Glenfiddich - Enabling works for new distillery
Date:
2016
Client:
Glenfiddich Distillery
Main Contractor:
Robertsons
Location:
Dufftown, Keith
Description:
In 2016, GD Construction were contracted by Robertsons to carry out pre enabling works on a project at Glenfiddich Distillery. This project involved redirecting a HV electric cable and cooling water pipe for a proposed new distillery. The civil engineering works involved excavation depths of around 5m deep which required extensive use of trench boxes due to the roadside location.