Installation of new warehouses and storage facilities (Phases 1 – 4)
Date:
2011 - Ongoing
Client:
The Macallan Distillery
Main Contractor:
Robertsons
Location:
Aberlour, Moray
Description:
Installation of new surface water drainage system up to depths of 7 metres and varying pipes sizes up to 900 mm diameter. Construction of access road throughout the site including kerbing. Excavating pad foundations for new storage facilties.