Drainage services(Phases 1 – 4), Construction of Office Buildings and Hotel
Date:
2012-2016
Client:
Drum Property Group Ltd
Main Contractor:
Leiths Group and Sir Robert McAlpine
Location:
Prime Four Business Park, Kingswells, Aberdeen
Description:
From 2012 to 2016, GD Construction were contracted by Leiths Group and latterly by Sir Robert McAlpine to carry out a wide range of drainage services on Phases 1, 2, 3 and 4 of the project. Installation of utility ducting and trenching for gas and water pipes and electric cables. Laying new foul water and storm systems including attenuation tanks for each building. GD Construction also carried out road works on the C89 link road into the business park, which included kerbing, ducting and drainage services.